Compare waterproofing quotes on the same basis
Enter up to three real contractor quotes. The tool normalizes each total into SAR/m², compares it with the planning band used by this site, and surfaces scope prompts you have not marked as addressed.
How to read the result
The planning bands are the same references used by the main calculator: SAR 40–55/m² for two-layer bitumen, SAR 70–90 for 5 cm PU foam, SAR 80–110 for TPO/PVC, and SAR 50–70 for a cementitious + bituminous system, then the site’s disclosed planning factors for city, surface condition and project size are applied.
They are not government tariffs and the tool does not rate contractor quality. A quote outside the band can be reasonable or unreasonable depending on materials, thickness, preparation, access, detailing, testing and warranty scope.
Next step
Read How to compare waterproofing quotes and How to read a waterproofing warranty before signing.